
Case Study: Piling in Dunkeswell Bridge, Devon
Project Brief: Dunkeswell Bridge, Devon, is a small arch based stone bridge, which has become structurally unstable caused by the increased weight and traffic. Unfortunately


Project Brief: Dunkeswell Bridge, Devon, is a small arch based stone bridge, which has become structurally unstable caused by the increased weight and traffic. Unfortunately

Project brief: As main Piling contractor on this project, we were required to provide a Contiguous Piled Retaining Wall around the perimeter of the property.

Project Brief To provide 21 piles to rebuild a garden wall; the existing wall had fallen down due to the tree roots, and the weight

Clapham common Basement: Project Brief; This was a very challenging site, with tight access on a small street, and a very small open site. The property

Jurassic Coast, Contiguous Piled Wall, Branscombe, Devon Project Brief: The site is situated on the side of Branscombe cliff, in Lyme bay. The cliff is

Piled Basement in Banbury, Oxfordshire Project Brief: To provide 81 number 300mm dia hollow stem piles to 9.0m to form a Contiguous Piled Retaining Wall,

Camden Town Piled Basement London Project Brief: Advanced Mini Piling Systems, was contracted to install 30 number 450mm dia Hollow Stem Contiguous Piles, for a
We are always happy to talk through our services in more detail so for more information please get in touch.